EN
040 28573297 Request a quote

Service

Industrial and commercial screed

Where pallet trucks roll, racking stands and large areas are made in one go, strength, flatness and pace count.

Power trowel on a large screed area in a commercial hall
In short

Screeds for commercial and industrial use are built under DIN 18560 as bonded screed (part 3), on a separating layer (part 4) or as heavy-duty screed (part 7). They carry higher loads than housing screeds and are power-trowelled on large areas. IGRO GmbH lays large areas with its own pump equipment in Hamburg and the surrounding region.

Bonded screed

The screed is firmly bonded to the concrete by a bonding bridge. All loads go directly into the load-bearing slab. That is the solution for heavy use, for example in warehouses, workshops and plant rooms. The substrate is milled or shot-blasted for this.

Screed on a separating layer

A film separates screed and substrate. This construction suits cases where the substrate does not allow a bond or waterproofing lies underneath, such as in basements and ancillary rooms.

Large areas in one go

On full floors and in halls we work in sections and trowel by machine. With our own screed pump we also reach deep buildings and upper floors. Bay sizes, joints and connections we agree in advance with site management. A look at our work is on the page References.

For general contractors and site management

  • Quotation from the bill of quantities
  • Coordination of dates and sections with the neighbouring trades
  • Flatness to DIN 18202, levels from the metre mark
  • Documentation of screed type, grade and laying date

FAQ

Questions about Industrial and commercial screed

What distinguishes industrial screed from normal screed?

Industrial screed is designed for heavy mechanical loads: higher strength classes, often bonded to the concrete and with a particularly resistant surface. The requirements are set by DIN 18560-7.

Does IGRO also lay large areas?

Yes. Full floors in housing and commercial building are part of our daily work. You can see examples under References.

Do you work as a subcontractor for general contractors?

Yes. We quote from the bill of quantities and agree sections and dates with site management.

Services

More services

Quote

Screed planned? Let's talk.

Tell us the area, screed type and desired date. You will receive a clear quotation.