For domestic loads up to 2 kN/m², floating screed under DIN 18560-2 needs a nominal thickness of at least 45 mm as cement screed CT-F4. With underfloor heating this figure applies as cover over the heating pipe. Bonded screed directly on the concrete can be thinner.
Minimum thicknesses in housing
| Construction method | Cement screed CT-F4 |
|---|---|
| Floating on insulation, unheated | min. 45 mm |
| Heated screed type A, cover over the pipe | min. 45 mm |
| Bonded screed | per design, thinner possible |
The values apply to imposed loads up to 2 kN/m², that is, living spaces. Higher strength classes such as CT-F5 allow smaller thicknesses, higher loads require more. The design sets grade and thickness, and the manufacturer's requirements take precedence.
Calculating build-up height: an example
Example for a new build with underfloor heating: 100 mm insulation, 17 mm heating pipe, 45 mm cover of cement screed and 15 mm parquet add up to roughly 177 mm build-up height above the structural slab. The screed itself is 62 mm thick in this example.
Weight: what the slab has to carry
Cement screed weighs about 21 kg per m² and centimetre. The 62 mm in the example therefore put about 130 kg on every square metre. In a new build this is allowed for. In an older building, a structural engineer should assess the slab. The quantity calculator shows the value for your thickness.
Little build-up height in older buildings
- Cement screed with a higher strength class: less thickness for the same load capacity, per design.
- Bonded screed: directly on the load-bearing substrate, without insulation.
- Thin-layer heating systems with levelling compound.
- Dry screed: light and with no drying time, especially on timber joist floors.
As of 25 November 2026. The information is general technical guidance. It replaces neither the design nor the manufacturers' data for your project.
