The market guide values for Germany in 2026, including laying, are about €20 to €35 per m² for cement screed and €30 to €50 for fast-drying screed. Insulation costs about €8 to €20 per m² extra, and screed over underfloor heating about €5 to €15 more. In large cities such as Hamburg, quotes are often at the upper end.
Market guide values 2026
| Item | Guide value per m² |
|---|---|
| Cement screed | €20 to €35 |
| Fast-drying screed | €30 to €50 |
| Dry screed | €30 to €55 |
| Insulation under the screed | additional €8 to €20 |
| Surcharge for underfloor heating | additional €5 to €15 |
What determines the price
- Area: travel and site set-up are spread over more square metres.
- Thickness and grade: every extra centimetre means more material and more pumping.
- Substructure: insulation, edge strips, film and the levelling of pipes.
- Access: floor level, hose route, standing place for the pump.
- Joints, doors and awkward floor plans add effort.
- Deadline: fast-drying screed and extra shifts cost extra.
Worked example: 100 m² in a new build
Cement screed over underfloor heating with insulation: 100 m² times €33 to €70 gives a range of about €3,300 to €7,000. The range is wide because insulation thickness, screed thickness and site vary so much. The cost calculator works out your range.
Comparing quotes properly
- Screed type and strength class are stated, for example CT-C25-F4.
- The thickness is given in millimetres.
- Insulation, edge insulation strip and film are listed as separate items.
- Joints, door openings and connections are included.
- Travel, site set-up and pump are included.
- For heated screed: who runs the heating and who keeps the protocol?
As of 25 November 2026. The information is general technical guidance. It replaces neither the design nor the manufacturers' data for your project.