Legal notice
Details under section 5 DDG
IGRO GmbH Baustellendienstleistungen
Kieler Straße 101
22769 Hamburg
Represented by
Managing director: Luan Avdiji
Contact
Phone: 040 28573297
Mobile: 0172 4539096, 0172 4431828
Fax: 040 28573204
Email: info@igrogmbh.de
Register entry
Entry in the commercial register
Register court: Amtsgericht Hamburg
Register number: HRB 179189
Responsible for the content
Luan Avdiji, address as above
Consumer dispute resolution
We are neither willing nor obliged to take part in dispute resolution proceedings before a consumer arbitration board.
Liability for content
The content of this website was prepared with care. The technical information, guide values and calculators serve general orientation. They do not replace design, structural checks or the manufacturers' data. We accept no liability for correctness, completeness or currency.
Liability for links
This website contains links to third-party websites. We have no influence on their content. The respective provider is responsible for the content of the linked pages.
Copyright and image credits
Texts, drawings and calculators on this website are protected by copyright. Photos and videos of sites and machines: IGRO GmbH Baustellendienstleistungen. City view of Hamburg and the photo of the pipes on the slab: Unsplash.