Screed cost calculator
What does screed cost for your area? The calculator shows a cost range based on market guide values. We give you a fixed price after the survey.
Market guide values for Germany, as of 2026, including laying. Not IGRO GmbH prices and not a quotation. In Hamburg, quotes are often at the upper end. We give you a fixed price after the survey.
Enquire with these valuesMarket guide values 2026 per m²
| Item | Guide value per m² | Note |
|---|---|---|
| Cement screed | €20 to €35 | including laying |
| Fast-drying screed | €30 to €50 | depending on system |
| Insulation under the screed | additional €8 to €20 | depending on material and thickness |
| Screed over underfloor heating | additional €5 to €15 | greater thickness, joints, extra effort |
The values are compiled from publicly available price overviews for Germany, as of November 2026. The sources differ widely and some quote gross, some net prices. Treat the figures as a guide, not as a quotation.
What actually determines the price
- Area: large continuous areas cost less per m² than small single rooms.
- Thickness and strength class: more material, more cement.
- Substructure: insulation, edge strips, film, levelling of pipes.
- Site: floor level, hose length, standing place for the pump, access.
- Deadline: fast-drying screed and short notice cost more.
How to compare quotes is covered in the guide Screed cost per m².
FAQ
Questions about Screed cost calculator
What does screed cost for 100 m²?
By the 2026 market guide values, cement screed for 100 m² costs about €2,000 to €3,500 and fast-drying screed about €3,000 to €5,000, each including laying and without insulation.
What does screed with insulation cost per m²?
Add about €8 to €20 per m² to the screed price for insulation, edge strips and film. Cement screed with insulation then comes to about €28 to €55 per m².
Are these IGRO GmbH prices?
No. The calculator shows market guide values for Germany. Our quotation depends on your site and lists every item separately.