Cement screed in Hamburg
The classic among screeds: insensitive to moisture, highly loadable and suitable for almost any covering. We mix it on site and convey it with the pump to every floor.

Cement screed (code CT under DIN EN 13813) consists of cement, sand and water. It is moisture-resistant and therefore also suitable for bathrooms, basements, garages and outdoor areas. Laid floating, the nominal thickness for CT-F4 is at least 45 mm. It is walkable after about 3 days and ready for covering at no more than 2.0 CM-% residual moisture.
When cement screed is the right choice
- Bathrooms, basements, garages, balconies and other areas where moisture can occur
- Heavily loaded areas, for example commercial, warehouses and workshops
- Underfloor heating, when a robust and proven solution is wanted
- Projects where the screed is to be mixed on site and conveyed in large quantities
How we lay cement screed
We mix the mortar damp-earth in the screed pump and convey it through the hose into the room. There it is spread, compacted, screeded to level with the straightedge and then floated and trowelled. We set the level with the rotary laser. The whole route is shown on the page Process.
Thickness and strength
Strength class and thickness are set by the design under DIN 18560. In housing, CT-C25-F4 is usual: 25 N/mm² compressive strength and 4 N/mm² flexural strength. On insulation the nominal thickness is then at least 45 mm. For heated screed this figure applies as cover over the heating pipe. Higher loads require higher grades or greater thicknesses. More in the guide Screed thickness and build-up.
Drying and readiness for covering
Cement screed must not dry out too fast in the first days: no draughts, no fan heaters, no direct sun. After that, regular airing in short bursts helps. The well-known rule of thumb of one week per centimetre applies only up to about 4 cm thickness and only in good room conditions. The CM test is binding: at most 2.0 CM-%, for heated screed 1.8 CM-%. The timeline planner works out the dates for your laying date.
What does cement screed cost?
As a market guide value for Germany in 2026, about €20 to €35 per m² including laying applies. Area, thickness, insulation, floor level and access for the pump determine the actual price. The cost calculator gives you a first range, a binding quotation follows after the survey.
FAQ
Questions about Cement screed
How thick must cement screed be?
Floating on insulation, the nominal thickness for CT-F4 is at least 45 mm (imposed load up to 2 kN/m², DIN 18560-2). With underfloor heating this figure applies over the heating pipe. As bonded screed directly on the concrete, smaller thicknesses are possible. The design sets the value.
When can I walk on cement screed?
As a rule carefully after about 3 days, and after about a week it is lightly loadable. It reaches full strength after about 28 days.
Is cement screed waterproof?
No. Cement screed is moisture-resistant, so it is not damaged by water, but it is not watertight. In bathrooms and other wet rooms, waterproofing therefore belongs under the covering.
Can cement screed crack?
Yes, if it dries too fast, if joints are missing or if bays are too large. Cement screed shrinks as it dries. That is why we plan movement joints, on heated areas as a rule for bays over about 40 m², side lengths over 8 m and in door openings.
Services
More services
-
01Heated screed
Screed over underfloor heating: correct pipe cover, joints and heating protocol.
Learn more -
02Fast-drying screed
When the programme is pressing: walkable sooner, ready for covering sooner.
Learn more -
03Screed on insulation
Thermal and impact sound insulation, edge strip and film as the substructure for floating screed.
Learn more -
04Industrial and commercial screed
Large areas for commercial use, halls and underground car parks: bonded screed and screed on a separating layer.
Learn more