Floating screed on insulation
The screed lies like a slab on the insulation and touches neither wall nor structural slab. That keeps the warmth in the room and the impact sound away from the neighbours.

Floating screed is a screed on an insulation layer, separated from all building elements by edge insulation strips. It improves thermal and impact sound insulation. For imposed loads up to 2 kN/m², the nominal thickness under DIN 18560-2 is at least 45 mm for cement screed CT-F4.
The build-up from bottom to top
- Structural slab, clean and flat. Pipes and cables are embedded in a levelling layer.
- Edge insulation strip at all walls, columns, door frames and penetrations.
- Insulation layer: impact sound insulation, combined with thermal insulation if needed, laid with staggered joints.
- Covering of PE film or system board, overlapped at the joints and turned up at the edge.
- Screed as the load-distributing layer in the planned thickness.
Why the edge insulation strip matters so much
A single mortar bridge between screed and wall carries impact sound into the whole building. The edge insulation strip therefore stays in place until the covering is laid and is cut off only afterwards. Pipes and door frames also get a sleeve.
Levelling for pipes on the structural slab
If cables lie on the slab, the insulation must not simply be laid over them or cut out around them. We restore a flat surface with a bound levelling fill or levelling insulation. Only on that does the impact sound insulation follow, at full thickness.
Insulation and screed from one source
When one firm carries out insulation, edge strips, film and screed, there is no interface and no argument about preliminary work. As a market guide value, insulation under the screed costs about €8 to €20 per m² extra. The suitable thickness is shown in the guide Screed thickness and build-up.
FAQ
Questions about Screed on insulation
What does floating screed mean?
The screed lies on an insulation layer and has no firm connection to the structural slab and walls. It can move freely, that is, float. That improves thermal and impact sound insulation.
Which insulation goes under the screed?
Usual are impact sound insulation boards of mineral wool or EPS and thermal insulation boards of EPS or PUR, often combined. Type and thickness follow from the sound insulation proof and the energy requirements.
Can floating screed be installed in an older building?
Yes, if build-up height and load capacity of the slab allow it. With little height or timber joist floors, thinner systems or dry screed are often the better choice. We look at it on site.
Services
More services
-
01Cement screed
The robust standard for housing, basements, garages and wet rooms.
Learn more -
02Heated screed
Screed over underfloor heating: correct pipe cover, joints and heating protocol.
Learn more -
03Fast-drying screed
When the programme is pressing: walkable sooner, ready for covering sooner.
Learn more -
04Industrial and commercial screed
Large areas for commercial use, halls and underground car parks: bonded screed and screed on a separating layer.
Learn more