Privacy policy
The key points in brief
- This website sets no cookies and stores nothing on your device.
- There are no analytics, advertising or tracking services.
- Fonts, images and videos come from our own server. No third-party content is embedded.
- The calculators run in your browser. Your entries are not transmitted.
Controller
IGRO GmbH Baustellendienstleistungen
Kieler Straße 101, 22769 Hamburg
Phone: 040 28573297
Email: info@igrogmbh.de
Hosting and server log files
When the website is accessed, the hosting provider processes technically necessary data in server log files: IP address, date and time of the request, the address requested, the amount of data transferred, browser and operating system, and the page visited before. The processing is necessary to deliver the website and to ensure its security. The legal basis is Art. 6(1)(f) GDPR. The log data is deleted after a short time.
Amazon Web Services EMEA SARL, 38 Avenue John F. Kennedy, L-1855 Luxembourg
Contact by phone, email and enquiry form
When you send the enquiry form, your details are transmitted in encrypted form and delivered to us by email. They are not stored on the website. The hosting provider named above handles transmission and sending in its data centre in Frankfurt am Main. To prevent abuse, your IP address is checked briefly. When you send the form, call us or send an email, we process your details to handle your enquiry and prepare a quotation. The legal basis is Art. 6(1)(b) GDPR, and for general enquiries point (f). We delete the data as soon as it is no longer needed and no statutory retention periods stand in the way.
Links to other websites
The link to the map leads to OpenStreetMap. Only when you click it does the provider there receive data from you. Its privacy policy then applies.
Your rights
You have the right to information about your data stored with us (Art. 15 GDPR), to rectification (Art. 16), erasure (Art. 17), restriction of processing (Art. 18), data portability (Art. 20) and to object to processing (Art. 21). To do so, contact the address given above.
You also have the right to lodge a complaint with a data protection supervisory authority. The authority responsible for us is the Hamburg Commissioner for Data Protection and Freedom of Information, Ludwig-Erhard-Straße 22, 20459 Hamburg.
Date
November 2026