Screed quantity calculator

How much screed does your area need? The calculator gives volume, weight and material requirement for cement screed and fast-drying screed.

Screed type
Volume… m³
Weight… t
Floor load… kg/m²
Bagged material, 25 kg… Bags
Cement (site mix)… kg
Screed sand 0/8… t

Guide values: bulk density of cement screed approx. 2,100 kg/m³, bagged material approx. 2.0 kg per m² and mm, site mix approx. 320 kg cement per m³. The mix for your project may differ.

Enquire with these values

How the quantity calculator works

The formula is simple: area in m² times thickness in metres gives the volume in m³. Example: 80 m² times 0.06 m is 4.8 m³. The bulk density turns that into weight: cement screed weighs about 2,100 kg per m³.

Screed thicknessVolume per 100 m²Load of cement screed
40 mm4.0 m³approx. 84 kg/m²
50 mm5.0 m³approx. 105 kg/m²
60 mm6.0 m³approx. 126 kg/m²
70 mm7.0 m³approx. 147 kg/m²

Bagged material or site mix?

For small areas you work with bagged material: about 2.0 kg of dry mortar per m² and millimetre of thickness, so roughly 20 kg per m² at 10 mm. On larger sites we mix the screed in the pump from cement and screed sand with a 0/8 grain size. The calculator shows guide quantities for this. The exact mix depends on the strength class required.

Why floor load matters

Every centimetre of cement screed adds about 21 kg per square metre. In older buildings and on timber joist floors, this weight decides which build-up is possible. If in doubt, have a structural engineer check the load capacity.

FAQ

Questions about Screed quantity calculator

How do you calculate the screed quantity?

Area in m² times thickness in metres gives the volume in m³. For 100 m² at 60 mm thickness that is 6 m³. Add 5 to 10 per cent reserve for unevenness in the substrate.

How much does screed weigh per m²?

Cement screed weighs about 21 kg per m² and centimetre of thickness. At 60 mm thickness that is roughly 126 kg/m².

How many bags of screed do I need per m²?

With ready-mixed mortar in bags, allow about 2.0 kg per m² and millimetre. For 1 m² at 50 mm thickness that is roughly 100 kg, or four 25 kg bags.