Glossary
Screed glossary from A to Z
The key technical terms around screed, briefly explained. Next to each term is the German word, which helps on projects in Germany.
B
- Bonded screed Verbundestrich
- Screed that is firmly bonded to the load-bearing substrate by a bonding bridge. See Industrial and commercial screed.
C
- Cement screed Zementestrich
- Screed with cement as binder, code CT. Moisture-resistant and universally usable. See Cement screed.
- CM test (carbide method) CM-Messung
- Measuring residual moisture with the calcium carbide method. A screed sample reacts with carbide in a pressure bottle, and the pressure shows the water content in CM-%.
- Compressive strength Druckfestigkeit
- The screed's resistance to compression, given as class C, for example C25 for 25 N/mm².
- Contraction joint (dummy joint) Scheinfuge
- A cut in the upper part of the screed that gathers shrinkage cracks at a planned place. It is closed later with a force-transmitting fill.
D
- DIN 18202 (tolerances) DIN 18202
- Standard for tolerances in building. It sets how flat a screed area must be.
- DIN 18560 (screeds) DIN 18560
- German standard for screeds in building. Part 2 covers floating screeds and heated screeds, part 3 bonded screeds, part 4 screeds on a separating layer, part 7 heavy-duty screeds.
- Dry screed Trockenestrich
- Screed made of boards that are laid dry. No drying time, low weight.
- Drying heating Belegreifheizen
- Deliberate heating of a heated screed to speed up drying until it is ready for covering. Follows function heating.
E
- Edge insulation strip Randdämmstreifen
- Strip of soft insulation material that separates the screed from walls, columns and door frames. Prevents sound bridges and takes up movement.
F
- Fast-drying screed Schnellestrich
- Screed with rapid-hardening cement or a drying accelerator, ready for covering after days instead of weeks. See Fast-drying screed.
- Flatness Ebenheit
- Permitted deviation of the surface from a plane, measured with straightedge and measuring wedge to DIN 18202.
- Flexural strength Biegezugfestigkeit
- The screed's resistance to bending, given as class F, for example F4 for 4 N/mm². For floating screed it is the decisive figure.
- Floating screed Schwimmender Estrich
- Screed on an insulation layer with no firm connection to slab and walls. See Screed on insulation.
- Function heating Funktionsheizen
- First heating of a heated screed under DIN EN 1264-4: 3 days at 20 to 25 °C, then 4 days at the maximum design temperature.
H
- Heated screed Heizestrich
- Floating screed with underfloor heating. In type A the heating pipes lie in the screed. See Heated screed.
- Heating protocol Aufheizprotokoll
- Document that records the heating of a heated screed day by day, with flow temperature and signatures. The timeline planner creates a template.
I
- Impact sound insulation Trittschalldämmung
- Insulation layer that does not pass footfall noise on into the slab. Effective only if the screed is separated all round by the edge insulation strip.
- Insulation layer Dämmschicht
- Layer of thermal and impact sound insulation under the floating screed.
L
- Levelling fill Ausgleichsschüttung
- Bound fill that embeds pipes and cables on the structural slab and creates a flat surface for the insulation.
M
- Metre mark (datum line) Meterriss
- A mark on the wall exactly one metre above the planned top of the finished floor. The reference height for all trades.
- Movement joint Bewegungsfuge
- A joint that separates the screed through its full thickness so that bays can move independently. Usual in door openings and on large heated areas.
N
- Nominal thickness Nenndicke
- The planned thickness of the screed. For heated screed type A it is measured over the heating pipe.
P
- Pipe cover Rohrüberdeckung
- Screed thickness over the heating pipe. At least 45 mm for cement screed CT-F4 is usual.
R
- Readiness for covering Belegreife
- The state in which the screed has dried far enough for the floor covering to be laid. It is proved with the CM test.
- Residual moisture Restfeuchte
- The share of water left in the screed. Limit values for readiness for covering: cement screed 2.0 CM-%, heated 1.8 CM-%.
S
- Screed Estrich
- A layer of mortar laid on a load-bearing substrate or on insulation. It levels heights, spreads loads and carries the floor covering.
- Screed pump (pneumatic conveyor) Estrichpumpe
- Machine that mixes screed mortar and conveys it with compressed air through a hose to the laying point. See Equipment.
- Screeding (levelling) Abziehen
- Levelling the fresh screed to the specified height with the straightedge. The height is set by the rotary laser or a gauge.
- Separating layer Trennlage
- Film between substrate or insulation and screed. It stops water from the mortar running down.
- Strength class Festigkeitsklasse
- Grading of the screed under DIN EN 13813, for example CT-C25-F4: cement screed with 25 N/mm² compressive strength and 4 N/mm² flexural strength.
T
- Trowelling Glätten
- Compacting and closing the screed surface with a trowel or power trowel.