Equipment
Screed pump, laser, power trowel
Good screed is craftsmanship. But without the right machine, no mortar reaches the fifth floor.

How it works
From the pile of sand to the fifth floor
The screed pump mixes in front of the building and conveys the mortar by compressed air through the hose into the room.
- 1
Loading
Sand, cement and water go into the mixing vessel.
- 2
Mixing
In a few minutes a damp-earth mortar is made.
- 3
Conveying
Compressed air pushes the mortar up through the hose.
- 4
Placing
In the room it is spread, screeded and trowelled.
How the screed gets to the floor
- 01
Loading
Sand, cement and water go into the mixing vessel of the pump.
- 02
Mixing
In a few minutes the vessel produces an even, damp-earth mortar.
- 03
Conveying
Compressed air pushes the mortar through the hose up to the floor.
- 04
Laying
In the room the mortar is spread, screeded and trowelled.
Rotary laser: the level is right in every room
A rotary laser projects a horizontal plane through the whole floor. At the receiver we read off at every point how high the screed has to be. So door thresholds, stair connections and transitions between rooms fit, and the flatness to DIN 18202 can be met.
Power trowel: a dense, flat surface
On large areas the power trowel compacts and smooths the screed with rotating blades. The surface becomes firmer and more even than by hand. Edges, corners and small rooms we work with the float and trowel.
Why our own equipment counts
Anyone who works with their own pump knows their machine and does not depend on a hire company for the date. The mortar is mixed fresh on site, and the quantity adapts to progress on the building. What the pump needs on site is in the guide Preparing the site.
FAQ
Questions about Equipment
How far can a screed pump convey?
That depends on the machine, hose and material. At the site visit we check the parking space and the hose route and tell you how we reach your floor.
How much space does the screed pump need?
Space for the trailer, the sand and the cement pallets, as close to the building as possible, plus a water connection. At the site visit we agree the standing place together.
Is the screed mixed on site?
Yes. We usually mix cement screed directly in the pump from sand, cement and water, so the mortar arrives fresh in the room.