
Screed contractor · IGRO GmbH
Screed in Hamburg. Laid dead level.
IGRO GmbH lays cement screed, heated screed and fast-drying screed for housing, commercial and refurbishment in Hamburg and the surrounding region. With our own screed pump and laser levelling, from bare slab to flat floor.
- Since 2014in the trade, registered as a GmbH in the commercial register
- Own equipmentscreed pump, laser and power trowel
- DIN 18560cement screed laid to the standard
- Hamburgand surrounding region: new build, commercial, refurbishment
Who we are
A screed contractor that can handle area.
IGRO GmbH has worked on sites in the north since 2014. Our focus is screed work: from a single room in an older-building refurbishment to a full floor in housing and commercial building.
We bring the equipment that large areas need: a screed pump that conveys the mortar up to the upper floors, rotary lasers for the level and power trowels for the surface.

- 12years in the trade
- 700+projects completed
- 5services around screed
- 11steps from survey to handover
Services
Screed work from a single source
Five services, one contact. We advise you on which screed suits the build-up, covering and programme.
-
01Cement screed
The robust standard for housing, basements, garages and wet rooms.
Learn more -
02Heated screed
Screed over underfloor heating: correct pipe cover, joints and heating protocol.
Learn more -
03Fast-drying screed
When the programme is pressing: walkable sooner, ready for covering sooner.
Learn more -
04Screed on insulation
Thermal and impact sound insulation, edge strip and film as the substructure for floating screed.
Learn more -
05Industrial and commercial screed
Large areas for commercial use, halls and underground car parks: bonded screed and screed on a separating layer.
Learn more - Advice
Which screed fits?
Tell us the room, the covering and the date. We recommend the right build-up and send you a clear quotation.
Request a quote
Floor build-up
Layer by layer to the finished floor
This is how a floating heated screed is built, from the structural slab to the covering. Click a step to see it for longer.
- 01
Check the structural slab
The concrete slab must be load-bearing, dry and swept clean. Cables on the slab are embedded beforehand in a levelling layer.
Substrate: reinforced concrete slab - 02
Edge insulation strip and insulation
The edge strip separates the screed from all walls. Thermal and impact sound insulation follow, tightly butted and without voids.
Thickness per thermal and sound insulation design - 03
Film or system board
A PE film or the system board of the underfloor heating covers the insulation. That stops mixing water running into the insulation layer.
Separating layer: laid overlapping, turned up at the edge - 04
Heating pipes
The heating engineer lays the pipes and tests them for leaks. Only after this test does the screed go in.
Pipes filled and under pressure during laying - 05
Place and screed
The pump conveys the mortar into the room. We spread, compact and screed it level to the laser height.
Cement screed CT-F4: at least 45 mm over the pipe - 06
Dry and heat
The screed hardens and gives off moisture. With heated screed, function heating follows. The CM test decides readiness for covering.
Heated cement screed: at most 1.8 CM-% - 07
Covering
Once the limit value is reached, parquet, tiles or design flooring can be laid.
Ready for covering: handover to the floor layer
Before and after
From bare slab to finished floor
Drag the slider: on the left the state before the screed, on the right the finished screed area.






From our sites
Real sites, real floors
Short clips straight from IGRO sites: placing, screeding, trowelling.
How it works
From the pile of sand to the fifth floor
The screed pump mixes in front of the building and conveys the mortar by compressed air through the hose into the room.
- 1
Loading
Sand, cement and water go into the mixing vessel.
- 2
Mixing
In a few minutes a damp-earth mortar is made.
- 3
Conveying
Compressed air pushes the mortar up through the hose.
- 4
Placing
In the room it is spread, screeded and trowelled.

Equipment
The pump brings the screed upstairs
Our screed pump mixes sand, cement and water right on the site. So quality stays the same from the first to the last square metre.
- Mixing
- fresh on site
- Conveying
- through the hose up to your floor
- Laying
- levelled to laser height and trowelled
Calculators
How much screed do you need?
Set area and thickness, read off the quantity. The full calculators also show drying time, heating protocol and cost range.
Process
In eleven steps to screed ready for covering
From survey to handover: this is how a screed project runs with IGRO.
- 01

Enquiry and survey
Site visit
- 02

Quotation and programme
written quotation
- 03

Prepare the substrate
before laying
- 04

Edge strip and insulation
depending on area
- 05

Covering and underfloor heating
Acceptance before the screed
- 06

Set the levels
on laying day
- 07

Mix and convey
continuously during laying
- 08

Place and screed
room by room
- 09

Trowel and joints
immediately afterwards
- 10

Dry and heat
days to weeks
- 11

Readiness for covering and handover
after the test is passed
Why IGRO
What you can expect from us
- 01
Our own equipment
Screed pump, rotary laser and power trowel are part of our equipment. We do not depend on hired machines.
- 02
Work to standards
Thickness, strength class and joints follow DIN 18560 and the design. We check flatness to DIN 18202.
- 03
One contact
From survey to handover you speak to the same person. We clear queries directly on site.
- 04
Large areas and single rooms
Full floors in housing and commercial building are as much part of our daily work as a single room in a refurbishment.
- 05
Clear quotations
Our quotation lists screed type, thickness, insulation, edge strip and joints separately. So you can really compare quotes.
- 06
In the trade since 2014
IGRO GmbH has been entered in the commercial register since 2014, today at the Amtsgericht Hamburg under HRB 179189.
FAQ
Frequently asked questions about screed
What does screed cost per m² in Hamburg?
As a market guide value for Germany in 2026, about €20 to €35 per m² applies for cement screed and €30 to €50 per m² for fast-drying screed, each including laying. Insulation, underfloor heating, thickness and access change the price. In a large city such as Hamburg, quotes are often at the upper end. You get a binding quotation from us after the survey. To the cost calculator
How long must screed dry?
As a rule of thumb for cement screed, about one week per centimetre of thickness up to 4 cm and two weeks for every further centimetre. That is only a guide value. Whether the screed is ready for covering is decided solely by the CM test: cement screed at most 2.0 CM-%, heated 1.8 CM-%.
When is screed walkable?
Cement screed is generally walkable after about 3 days, fast-drying screed after as little as one day, depending on the product. Cement screed is fully loadable only after about 4 weeks. The manufacturer's data applies.
Which screed is suitable for underfloor heating?
Cement screed is the proven choice: it is insensitive to moisture, spreads the heat evenly and suits every floor covering. Over the heating pipe, at least 45 mm is usual for cement screed CT-F4. When the schedule is tight, fast-drying screed is an option. More on heated screed
Which areas does IGRO work in?
All of Hamburg and the surrounding region, for example Norderstedt, Pinneberg, Wedel, Ahrensburg and Reinbek. Larger projects we also take on beyond that.
How do I get a quotation?
Call us on 040 28573297 or send us the area, desired screed type and date through the enquiry form. For a binding quotation we look at the site or work from your plans.
Service area
On the move in Hamburg and the surrounding region
We are based on Kieler Straße in Hamburg-Eimsbüttel. From there we reach sites across the city and the metropolitan region.
- Altona
- Eimsbüttel
- Hamburg-Mitte
- HafenCity
- Hamburg-Nord
- Wandsbek
- Bergedorf
- Harburg
- Norderstedt
- Pinneberg
- Wedel
- Ahrensburg
- Reinbek
- Buxtehude
- Stade
- Lüneburg
- Elmshorn
- Itzehoe