EN
040 28573297 Request a quote

Guides

Screed types compared

Which types of screed are there, how do they differ and which suits which room? The overview with tables.

Two screed layers levelling the screed with a straightedge
In short

Screeds are distinguished by binder and by construction method. In housing and commercial building, cement screed (CT) is the standard: moisture-resistant, load-bearing and suitable indoors and outdoors. Fast-drying screed is the variant for tight schedules. By construction method there are bonded screed, unbonded screed on a separating layer, floating screed on insulation and heated screed.

Screed types by binder

Screed typeCodeStrengthsLimits
Cement screedCTmoisture-resistant, strong, indoors and outdoorsshrinks, needs joints, dries more slowly
Fast-drying screedmostly CTready for covering after daysdearer, short working time
Mastic asphalt screedASusable at once, water-free, thinlaid hot, specialist trade
Synthetic resin screedSRthin, chemically resistant, fastexpensive, for special cases
Magnesite screedMAhigh strengthmoisture-sensitive, rare today
Dry screedboardsno drying time, lightlower load capacity, different build-up

Screed types by construction method

Construction methodPrincipleTypical use
Bonded screedfirmly bonded to the substrateheavily loaded areas, basements, commercial
Unbonded screed (on a separating layer)separated from the substrate by a filmancillary rooms, over waterproofing
Floating screedon insulation, with no contact to wall and slabhousing, sound and thermal insulation
Heated screedfloating screed with heating pipesunderfloor heating

Which construction method for which room?

  • Wet rooms, basements, garages, balconies: cement screed, usually bonded or on a separating layer.
  • Flats above occupied rooms: floating screed on impact sound insulation.
  • Rooms with underfloor heating: heated screed with at least 45 mm over the pipe.
  • Halls, warehouses, underground car parks: bonded screed of high strength.
  • Tight schedule: consider fast-drying screed.

How to read the designation CT-C25-F4

The designation under DIN EN 13813 first names the binder: CT stands for cement screed. C25 is the compressive strength class with 25 N/mm², F4 the flexural strength class with 4 N/mm². For floating screeds, flexural strength is the decisive figure, because together with thickness it determines what load the screed slab carries.

As of 25 November 2026. The information is general technical guidance. It replaces neither the design nor the manufacturers' data for your project.

FAQ

Frequently asked questions

Which screed is best for the bathroom?

Cement screed, because it is moisture-resistant. That applies above all to level-access showers. Waterproofing belongs under the covering in every case.

Which screed belongs in a garage?

Cement screed, usually as bonded screed or on a separating layer. It tolerates moisture and carries high loads. A coating protects the surface from road salt and oil.

What is dry screed?

Dry screed consists of boards, for example gypsum fibre, laid dry on a fill or insulation. It brings no moisture into the building and can be covered at once, but carries less than a mortar screed.

Guides

More guides

Quote

Screed planned? Let's talk.

Tell us the area, screed type and desired date. You will receive a clear quotation.